Tender-compliant supply, with the paperwork that closes your file
Public procurement fails on documentation far more often than on equipment. We treat the compliance pack as a primary deliverable rather than something produced three months later after a series of reminder emails.

Our registration status, stated plainly
Our KPPRA EPADS registration is in progress rather than complete. We would rather say that here than have a procurement officer discover it at bid evaluation, and we would rather lose an opportunity than misrepresent our position on a compliance document.
In the meantime we supply departments through direct and limited-tender procurement routes where EPADS is not the mechanism, and we prepare full compliance documentation for departments evaluating suppliers ahead of formal processes. If registration is a hard prerequisite for something you are running,ask us and we will give you a straight answer on timing.
A department raises a requirement, receives bids, awards, takes delivery — and then spends three months chasing the supplier for the compliance statements, warranty certificates and serial listing that audit needs to close the file. The equipment was fine. The documentation was an afterthought, and the procurement officer carries that internally.
The second recurring failure is scope. Tender language across Khyber Pakhtunkhwa consistently specifies supply, installation, commissioning, training and after-sales support — the full lifecycle. A great deal of equipment nonetheless arrives at a reception desk from a trading company that never intended to install anything, leaving the department with boxed hardware and a completion certificate it cannot honestly sign.
Both problems are solvable at bid stage, and both are what this page is about.
What arrives with the goods, as standard
Not on request. Not three weeks later. With the consignment, because that is when your process needs it.
Line-by-line BOQ compliance
Every item marked compliant, equivalent or non-compliant with a written reason, structured to the BOQ line format so committees can evaluate item by item.
Substitution justification
Manufacturer specification sheets attached for every equivalent proposed, demonstrating it meets or exceeds each stated parameter.
Itemised delivery challan
Line by line against the purchase order, signed on an itemised list rather than a carton count.
Warranty certificates
Per warrantable item, with the service location named and claim administration confirmed as ours.
Serial number listing
Full listing for capital equipment, so you can verify against manufacturer records independently.
Commissioning record
Per site, documenting what was installed, tested and handed over — which is what a completion certificate is meant to represent.
From BOQ to commissioned installation
Public-sector awards follow a different sequence to commercial work, and our process reflects that.
BOQ review and compliance mapping
We work through the BOQ line by line before quoting, identifying every item where the specification names something discontinued and preparing the equivalent with supporting documentation. This happens before submission, not afterwards.
Itemised bid to the BOQ line structure
Quoted in the format the tender uses so a committee can evaluate without reconciling different structures between bidders. Installation, commissioning and training priced as separate identified lines rather than absorbed into equipment cost.
Delivery scheduling against receiving capacity
District offices frequently cannot absorb a full consignment at once. We schedule against what each site can actually receive and store, including per-site splits on a single award.
Installation and commissioning by our technicians
Not subcontracted. Each site gets a commissioning record documenting what was installed, tested and demonstrated, so the completion certificate reflects something real.
Training with an attendance record
Hands-on sessions with the staff who will actually operate the equipment, plus an attendance record for the completion file, and a follow-up visit where the scope allows.
Documentation handover and warranty administration
The full compliance pack delivered with the goods, and warranty claims administered by us for the life of the coverage rather than handed back as a service centre number.
District offices rarely have the infrastructure a BOQ assumes
A recurring problem in KPK departmental procurement is a BOQ specifying computers and networking for a district or tehsil office with no provision for the cabling, containment or protected power those items require — because whoever drafted it worked from a headquarters environment where those things already exist. The award is made, the equipment arrives, and there is nowhere to plug it in.
A site condition check before drafting produces a BOQ that survives delivery. We carry those out without obligation for departments across the province, and you are under no expectation to buy from us afterwards.
We also published a practical guide toregistering as a vendor on EPADS— what you need, what trips suppliers up, and what happens at bid stage.
Categories we supply to public sector
Tendering and compliance
Is H4 Global registered on the KPPRA EPADS portal?
Registration is in progress rather than complete, and we state that plainly rather than letting a procurement officer discover it at bid evaluation. In the meantime we work with departments through direct and limited-tender procurement routes where EPADS registration is not the mechanism, and we prepare full compliance documentation for departments evaluating suppliers ahead of formal processes. If EPADS registration is a hard prerequisite for a specific opportunity, contact us and we will tell you honestly whether our status will be resolved in time.
How do you handle a BOQ specifying equipment that is no longer manufactured?
We quote it as an equivalent and document why, rather than claiming compliance we cannot support or declining to bid. Each affected line is marked as equivalent with a written justification, and we attach the manufacturer specification sheet showing the proposed item meets or exceeds every parameter the BOQ actually stated — processor performance, memory, duty cycle, resolution, warranty term, whichever measures apply. That documentation is what lets a procurement committee record a defensible decision, which protects the department as much as it protects us.
What documentation do you supply for audit?
A delivery challan itemised line by line against the purchase order, a GST invoice, warranty certificates for each warrantable item, a full serial number listing for capital equipment, and a commissioning record for anything installed. Where the award originated from a tender we also include the line-by-line compliance statement with manufacturer documentation for any equivalent supplied. The pack is assembled to close an audit query on first reading rather than generating a follow-up request weeks later.
Can you deliver a single award across multiple district offices?
Yes, and for provincial departments this is usually the more sensible arrangement. We split the consignment across delivery locations, provide a per-site manifest so each district office can verify what it should have received, and return signed delivery confirmations from every site against one central invoice. Delivering everything to a headquarters for onward redistribution is where consignments most reliably go missing across KPK, and it leaves receiving offices with no documentation of their own.
Do you provide training as part of a supply and installation contract?
Yes, and we treat it as scope rather than a line to be trimmed. Where a tender specifies training we deliver hands-on sessions with the staff who will genuinely operate the equipment, and provide an attendance record for the completion file. This matters most on surveillance systems and interactive displays, where equipment nobody was shown how to operate reliably ends up unused or misconfigured within months. A follow-up session some weeks later is usually more valuable than a longer session on handover day.
Send us the BOQ and we'll map it line by line.
You will get a compliance response marking each item compliant, equivalent or non-compliant, with manufacturer documentation supporting every substitution proposed.